Solid wood stair floor installation method-Multi Purpose Mats
1. In the paving way, it is necessary to distinguish the floor type selected. Suspension installation is generally adopted for reinforced and composite floors, and keel installation is adopted for solid wood floors. If the laminate floor or solid wood composite floor, it can be paved directly on the stairs by laying 3mm floor MATS. If the wood floor is solid, you can hit the keel on the stairs first, lay a layer of wood on the keel, and then use elastic adhesive, or by air nails or keel nails to fix it. The adhesive method is relatively economical and practical, and the construction is simple and convenient. Although the way of nail paving cost, but beautiful and durable, and stable performance, later if need to replace the floor is also very convenient.
2. After the materials are ready and the installation method is in mind, the real preparatory work will begin. One step, is to leveling, measuring the flatness of the stairs, per meter error more than 3mm need to be levelled. This step is not trouble, careful handling can, of course, most people are sure to ask people to do, there are professional construction personnel in nature is good, they know more about the inside, there is no harm.
3. After leveling is to start the installation, before starting to pay attention to a sequence problem! It is recommended that the installation sequence is installed from the bottom to the top, so that the installation operation is more convenient and check the compressive strength and standardization of the stair floor.
4. Subsequently, when installing flat floors, it is often necessary to cut and assemble the floors. This is highly related to the measurement level of workers, if the measurement line is not standard when cutting, it will lead to too large joints. When cutting the floor, if the worker cutting is not accurate, it will lead to a significant sense of difference in the stair floor after installation, which seriously affects